Hang wings in the wind
Industry status
1. Implement support for surrounding areas suitable for offshore wind power characteristics
- Provide onshore power generation (within 5km from the generator) and other surrounding areas2. Strengthening local support through local government-led projects
- Contributing to the development of local communities by giving REC weight (maximum 0.1) to local1. Establishment of pre-notification procedure before permission for power generation
business
1. Introduction of construction method to minimize environmental impact and use of products
- Application of construction method to minimize noise, vibration, and floating debris2. Mandatory monitoring of the marine environment
- Investigate the impact on the marine environment for up to three years after the completion