사단법인 국제해상풍력협회

Hang wings in the wind

Industry status

01 Location review
  • ① Wind Resources and installation condition review
        : Wind resource map, Local residents Acceptability

  • ② System linkage review
        : Check substation capacity / Transmission line review
  • 02 Wind Resources Investigation
  • ① Land, Maritime usage plan review - Maritime energy development
         zone review(Marine Space Planning and Management Act)

  • ② Installation of maritime wind instruments (including lidar) and
        measurement of resources (over 1 year)
        : In-advance licensing and authorization including maritime survey,
        design, and authorization for the use of shared surface points

  • ③ Local autonomous entity (local government), landowners, owners
        of fishing ground
        : Local residents information sessions and public hearings
  • 03 Environmental Location Investigation
  • ① Marine Environment Investigation: Ground, geological features,
         water depth investigation, etc.

  • ② Preliminary analysis of the surrounding environment
         : Transportation, Assembly, Installation related - Landscape, on-land
         animal and flora, noise, vibration, waste, marine ecosystem, etc.

         
  • ③ Military operability review (Ministry of Defense)
  • 04 Business feasibility review
  • ① Micro-siting
         (generator model review, substructure review, and selection)

  • ② Business feasibility evaluation

  • ③ Business plan confirmation and basic design
  • 05 Authorization for power generation business
  • ① Authorization for power generation business
         - Over 3,000kW : Ministry of Trade, Industry and Energy authorization
         (Application and authorization of Electric Commission)

  • ② #1 : Must install wind meter and measurement data for over 1 year
  • ③ #2 : Must go through a process of collecting opinions from the local residents
  • 06 System Linkage Application
  • ① Sign a contract for the use of electrical installation
         for power transmission
  • 07 Design of wind farm
  • ① Detailed design of wind farm (foundation, transmission line,
         generator arrangement, transportation, installation, etc.)
  • 08 Development authorization
  • ① Cultural asset index investigation(Cultural Heritage Administration)
  • ② Usage agreement for shore region (Ministry of Oceans and Fisheries)
  • ③ Maritime Traffic safety diagnosis (Ministry of Oceans and Fisheries)
  • ④ Authorization to use shared water surface points (Ministry of Land,
         Infrastructure, and Transport, Regional Port Authority)
  • ⑤ Other local autonomous entity (local government) licensing &
         authorization
  • ⑥ Military Operability Review (Ministry of National Defense)
  • 09 Consultation for resident compensation
  • ① Damage investigation service

  • ② Consultation for resident compensation
  • 10 SPC composition and PF
  • ① SPC composition and PF
  • 11 Construction of the wind farm
  • ① Preliminary arrangements including base harbor and construction site
  • ② Installation of the base for the generator and substation
  • ③ Installation of submarine and on-land cable
  • ④ Transportation and installation of generators and substations
  • ⑤ Test operation and performance inspection, completion inspection
         Inspection of completion of the wind farm (local governments)
         > Inspection of electric installations prior to use
         (Korea Electric Safety Corporation) > Confirmation of facility
         installation for REC application (Korea Energy Agency(KEA))
  • 12 Start of Operation
  • ① Completion of generators and initiation of commercial operation

  • ② Monitoring and post-environmental impact investigation
         (local governments, Ministry of Environment)

  • ③ Maintenance and repairment of generators and offshore base